Execution

Biomass feeding system in Barlinek

In 2018, Ecoserv executed an internal biomass feeding system for Energik M. Szamałek Z. Szamałek Sp. Jawna for the boiler installed at the Barlinek Inwestycje Sp. z o.o. production plant.

The net contract amount was approx. PLN 200,000.

With a maximum capacity of 14 t/h and a density of 300 kg/m3, the system involved feeding biomass from the movable floor feeders to the boiler hopper. It consisted of a horizontally inclined chain conveyor feeding biomass onto a belt conveyor equipped with a scale, over which a magnetic separator was installed.

Scope of works:

  • Preparation of design documentation for the feeding system.
  • Delivery of technological equipment, including conveyors, conveyor belt scales, and a magnetic separator.
  • Assembly of the supplied equipment.
  • Participation in system commissioning and acceptance.

Branch: Wood industry

Location: Barlinek

Design: Ecoserv

Execution date: 2018